40M BY 20M FULL ARENA CONSTRUCTION UNDER WAY FOR ISPCA MALLOW

IMG_0698IMG_0699IMG_0700IMG_0701

Installation Site for the new 40m by 20m outdoor arena has been levelled and Drains are just going in, The surface type will be Silica sand and Fusion Fibre, today will see the drains filled with pea gravel and the lower membrane installed, we will also be taking delivery of the stone for the filtration base.