Formats: Image
UCD Veterinary Department Lunge Ring
Equestrian Surfaces resurfaced Ucd veterinary department lunge ring, Our installation team removed the old Wexford sand and fibre mix and have Installed Cushion Track Waxed.
BEFORE
AFTER
Claremorris 40m by 20m completed yesterday
The Full construction of the 40m by 20m outdoor arena in Claremorris was completed yesterday. the finished surface is a blend of washed and graded silica sand and polypropylene stabilizer fibre.